St Thomas Boteler High School, Warrington

Eight Badminton court sports hall with sports equipment storage. Adjacent amenities include two offices, reception desk, small Kitchen, public as well as accessible toilets and first aid room. Two changing rooms each for 32 persons.

Cost: £1.1m inc Fees (excluding VAT) Location: Warrington Opened: Spring 2005 Cost per sq metre: TBC

Project Challenges

We have faced a variety of challenges throughout our time developing sports halls. Each project generally presents its own set of complications, sometimes relating to existing structures, surrounding areas or site conditions and in other cases, it’s purely about budget, keeping numerous funding partners happy, or meeting a deadline.

Project Solution

Each unique set of circumstances, is thought about and considered, in depth, by Ball Hall at the outset of the project. We bring all of our previous experience and expertise to the fore and try where possible, to apply a combination of creative and pragmatic thinking to problem solve in each case.

Ball Hall Added Value

With all the difficulties of a project considered upfront and contingency built in for unforeseen events or conditions, Ball Hall deliver outstanding buildings for sport. A Ball Hall Sports Hall often exceeds expectation and consistently becomes a flag waving celebration for the organisation, with many further benefits that materialise over time.

“The answer to our prayers ! A first class sports facility at a fraction of the prices other companies were quoting. They have been flexible enough to adapt designs to suit our specific requirements.”

John Sharples, Headteacher, Sir Thomas Boteler Church of England High School, Warrington