Project Solutions
Ball Hall implemented a range of solutions tailored to the sensitive needs of the school environment and the unique requirements of each site.
A structured communication plan kept the schools informed of major developments, while contractors were briefed to understand student needs, and maintain a calm environment. Close collaboration with school staff ensured changing rooms were safe, robust, and aligned with the specified colour scheme, with lighting and acoustics designed sensitively.
To minimise disruption, an alternative access route was arranged for taxis entering the school, ensuring that student arrivals remained orderly and undisturbed by construction activities.
At Swanley, a ground investigation survey was conducted, and we worked closely with structural engineers and contractors to determine the safest, most efficient approach for removing the swimming pool and addressing asbestos concerns.
In Tunbridge Wells, located within the High Weald Area of Outstanding Natural Beauty, specialist landscape professionals were engaged to conduct a visual impact assessment, ensuring the design complemented the surrounding environment. Colours and materials were carefully selected to meet planning requirements and blend seamlessly with the landscape.