University of East London, Docklands

Four badminton court sports hall with equipment storage, adjoining the existing gymnasium and amenities. Two additional changing rooms, accessible changing toilets and amenities. Classroom / Meeting Room Link corridor to
existing building.

Cost: £15m inc.fees (excluding VAT] Location: London Docklands, Newham Opened: Spring 2012 Cost per sq metre: TBC

Project Challenges

We have faced a variety of challenges throughout our time developing sports halls. Each project generally presents its own set of complications, sometimes relating to existing structures, surrounding areas or site conditions and in other cases, it’s purely about budget, keeping numerous funding partners happy, or meeting a deadline.

Project Solution

Each unique set of circumstances, is thought about and considered, in depth, by Ball Hall at the outset of the project. We bring all of our previous experience and expertise to the fore and try where possible, to apply a combination of creative and pragmatic thinking to problem solve in each case.

Ball Hall Added Value

With all the difficulties of a project considered upfront and contingency built in for unforeseen events or conditions, Ball Hall deliver outstanding buildings for sport. A Ball Hall Sports Hall often exceeds expectation and consistently becomes a flag waving celebration for the organisation, with many further benefits that materialise over time.

“John Lloyd is highly experienced. More importantly he is also highly respected within the sport. His honesty, integrity and sense of fair play is unquestioned.”

Betty Codona OBE, Chair England Basketball on their endorsement of Ball Hall.